Pre Zinc Coated Steel Hollow Section Q235 ERW Low Pressure Liquid Tube Galvanized Pipe for Irrigation

Pre Zinc Coated Steel Hollow Section Q235 ERW Low Pressure Liquid Tube Galvanized Pipe for Irrigation

Model NO.:steel pipe

Zinc Coating:60-400G/M2

Standard:GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3

Pipe End:Plain Ends

Length:1-12m

Trademark:Honest

Transport Package:Packed by Steel Strips, Plastic Bags

Specification:1/2"-12"

Origin:Tianjin, China

HS Code:7306309000

 

Description

Specifications List
 

Commodityhot dipped and pre-galvanized steel pipe
OD10-600mm(round)
thickness1.2-30mm
length3-12m or as per customers' requirements

material
Q195-Grade B, SS330, SPC, S185
Q215-Grade C,CS Type B, SS330, SPHC
Q235---Grade D, SS400, S235JR, S235JO, S235J2
Q345---SS500, ST52
StandardGB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88
BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L,GB/T9711.1-99 etc
zinc coatingpre galvanized steel pipe: 60-150g/m2
hot dipped galvanized steel pipe:200-400g/m2
applicationWidely used in Structure, Accessorize,Construction, 
Fluid transportation,machinery parts,the stress parts of the automobile
tractor parts and so on


Package
1) Big OD: in bulk
2) Small OD: packed by steel strips
3) Plastic bags
4) According to customer's requirement
DeliveryNormally 7-20 days after get deposits or according to quantity
CertificationISO 9001-2008 BV TUV SGS


advantage
1. reasonable price with excellent quality
2, abundant stock and prompt delivery
3, rich supply and export experience, sincere service


Product show

DN50-Hot-Dipped-Galvanized-Steel-Pipe.webp.jpg


Technological Process
1.Pre galvanized steel pipe

DN50-Hot-Dipped-Galvanized-Steel-Pipe.webp (1).jpg


2.Hot dipped galvanized wire

DN50-Hot-Dipped-Galvanized-Steel-Pipe.webp (2).jpg


Packing:

DN50-Hot-Dipped-Galvanized-Steel-Pipe.webp (3).jpg


Our Services

1632989178669287.jpg

1632989204270960.jpg



FAQ

Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need new special and rare materials,usually need 15-20 days to make shipment.


Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.


Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.

Q6. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.

Related Product

Chat with us