Galvanized steel pipe

Galvanized steel pipe

Model NO.:steel pipe

Zinc Coating:60-400G/M2

Standard:GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3

Pipe End:Plain Ends

Length:1-12m

Trademark:Honest

Transport Package:Packed by Steel Strips, Plastic Bags

Specification:1/2"-12"

Origin:Tianjin, China

HS Code:7306309000

 

Description

Specifications List
 

Commodityhot dipped and pre-galvanized steel pipe
OD10-600mm(round)
thickness1.2-30mm
length3-12m or as per customers' requirements

material
Q195-Grade B, SS330, SPC, S185
Q215-Grade C,CS Type B, SS330, SPHC
Q235---Grade D, SS400, S235JR, S235JO, S235J2
Q345---SS500, ST52
StandardGB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88
BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L,GB/T9711.1-99 etc
zinc coatingpre galvanized steel pipe: 60-150g/m2
hot dipped galvanized steel pipe:200-400g/m2
applicationWidely used in Structure, Accessorize,Construction, 
Fluid transportation,machinery parts,the stress parts of the automobile
tractor parts and so on


Package
1) Big OD: in bulk
2) Small OD: packed by steel strips
3) Plastic bags
4) According to customer's requirement
DeliveryNormally 7-20 days after get deposits or according to quantity
CertificationISO 9001-2008 BV TUV SGS


advantage
1. reasonable price with excellent quality
2, abundant stock and prompt delivery
3, rich supply and export experience, sincere service


Product show

DN50-Hot-Dipped-Galvanized-Steel-Pipe.webp.jpg


Technological Process
1.Pre galvanized steel pipe

DN50-Hot-Dipped-Galvanized-Steel-Pipe.webp (1).jpg


2.Hot dipped galvanized wire

DN50-Hot-Dipped-Galvanized-Steel-Pipe.webp (2).jpg


Packing:

DN50-Hot-Dipped-Galvanized-Steel-Pipe.webp (3).jpg


Our Services

1632989178669287.jpg

1632989204270960.jpg



FAQ

Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need new special and rare materials,usually need 15-20 days to make shipment.


Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.


Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.

Q6. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.

Related Product

Chat with us